NEW GE DPX X-Ray Tube
Refurbished Housing (DOM: 2000)
New Insert, Oil, Seals, Bellow, Expansion Chamber.
Pressure Tested and Stability Tested
PN: LNR2288 LU2288
SN: B9648
There is a 3-7 day lead time upon order. The insert is loaded into the prepared housing when your order is placed then testing takes place for the next 12-24 hours.
NEW GE Lunar DPX X-Ray Tube
The tabs below show product description and additional information about this item including purchase options of Outright and/or Exchange.
1 in stock
We invite you to Make An Offer if you feel the price needs adjustment or you would prefer the exchange price, where available.
Condition | New |
---|---|
Returnable | |
Purchase Option | |
System Part Was Installed On | |
Warranty |
LRN2288
LU2288
Related products
Battery and UPS Back-Up
Calibration
Electronic Components